GC Fitout FAMI Site-specific Induction Record – Docusafe

GC Fitout FAMI Site-specific Induction Record

To be completed by all GC Fitout Personnel

"*" indicates required fields

Inductee Name*

1.Project Description/Scope of Works

Construction works comprising of CAT B fit-out works to c. 483 sqm. of existing CAT A office space including:

  • New fire rated and non-fire rated stud partitions
  • Glazed partitions
  • Associated doors and joinery installations
  • Tape and joint and decorating walls
  • Laying of new floor coverings to canteen and lobby
  • New tea-statio

Mechanical and electrical works comprising.

  • CAT B MEP installations to suit the new layout configuration
  • Installation of general lighting and task lighting
  • Fire alarm
  • Access control
  • Intruder alarm
  • Cctv
  • IT Data installation
  • Emergency lighting
  • Installations of new HVAC
  • Plumbing supplies and waste to tea-station
  • Comms room installation including 4nr racks and UPS
  • Commission and testing of all installations

Site Team Members/Site Layout

Project Manager Robert Carton – 0876304170

Site Manager - TBC

2.Access & Egress/Emergency Exits

  • Site Entrance door will be open between the hours of 7am to 8.30am every morning. This door will be closed and only opened when permission has been approved by GCF Site Manager. Note: There is a busy coffee shop located right beside the site entrance door special care is required when entering the building.

3.Site Specific Safety Rules

  • ALL OPERTIVES ARE REQUIRED TO SIGN IIN/OUT DAILY VIA SITE QR CODE.
  • NO WORKS TO BE CARRIED OUT OUTSIDE UNIT
  • NO HI-VES VEST WEARING IN SHOPPING CENTRE
  • 3 POINT PPE AT ALL TIMES ON SITE
  • NO SMOKING ON SITE OR OUTSITE THE SHOPPING CENTRE. ONLY USE DESIGNATED GCF SMOKING AREA BESIDE HOLDING AREA
  • NO WORKS TO START ON SITE UNTIL ALL RAMS/SPA’S/GA3/HOT WORK PERMITS ETC. ARE COMPLETED

4.Deliveries

All deliveries to site to be booked in two days in advance.

Note: Early morning deliveries only permitted 7am- 9am

5.Clean As You GO

  • All Sub-Contractors are responsible for always keeping the site safe and tidy. If GCF management, feel this is not being adhered to on site they will action accordingly and contra charge for the cleaning of the site and any other areas of the building if necessary.

6.Lock out/tag out arrangement

Please speak with GCF Site Management prior to starting any works in the building/unit.

Please treat every service as live until it has been confirmed otherwise by the management team.

7.Welfare Facilities

On site welfare facilities are provided, please refer to point number 2 above.

8. Sign Inn Station/Notice Board.

Please ensure when you arrive on site you carefully read the on-site notice boards, it has all of the site-specific information you require in the event of an emergency.

I wish to confirm that I attended a Safety Induction Training Course. Guidance was given in relation to the following matters. Tick to indicate subjects discussed;*
Do you agree to abide by the site rules and to wear the correct PPE at all times?*
Have you been briefed on your company safety statement & project method statement?*
Are you a ‘Young Person – under 18 years of age’?*
DD slash MM slash YYYY